Why are the shafts/regulators proposed at these locations? Can they be moved to a different location?
The proposed locations are driven by the existing sewer outfalls, whose flows are directed to the tunnel system. Like the tunnel alignment, the preliminary location of the shafts and regulators was established as part of Preliminary Planning in 2017-2020 and was solidified during the early stages of final design.