The A58 site is located at the corner of River Avenue and Voeghtly Street in Pittsburgh, just steps from the main AS1 construction site. Like other sites along the tunnel route, it will serve as an entry point into the tunnel system, capturing combined sewage from the existing sewer system and directing it into the tunnel deep below ground.
Construction at A58 will include a vertical shaft approximately 25 feet wide and 130 feet deep, along with a connection to the main Ohio River Tunnel. The site will also include two connections to the existing combined sewer system and modifications to the existing outfall at the end of Voeghtly Street.
Once construction is complete, a small above-ground control building will remain at the site. One of only two such structures planned for the entire Ohio River Tunnel project, the building will house equipment used to manage and control the flow of combined sewage into the tunnel system.
River Avenue/Voeghtly St, Pittsburgh Directions: Google Maps Apple Maps
Beneath the surface
Go beyond the construction fence and explore the A58 site.
Underground Cross Section
Cross-section illustration of the Ohio River Tunnel facilities underneath the A58 site located near the intersection of Voeghtly Street and East Lacock Street on the North Side. Existing sewers connect to two regulators that direct overflow into a vertical drop shaft approximately 130 feet deep and 25 feet in diameter. The drop shaft connects to the Ohio River Tunnel through an underground connector tunnel located about 140 feet below ground surface along the Allegheny River. The image also shows a proposed gate control building and tunnel vent location. Surface buildings, streets, the Three Rivers Heritage Trail, trees, and subsurface soil and bedrock layers are displayed to illustrate the local context.
Aerial Site Plan
Aerial site plan showing the location of the Ohio River Tunnel (ORT) facilities underneath the A58 site at a parking lot located near the intersection of River Avenue and Madison Avenue on the North Side. A connector tunnel connects two regulator and a drop shaft to the ORT. Other facilities include tunnel vents, a gate control building, and a modified outfall. A temporary sewer for construction water will connect to existing ALCOSAN infrastructure. The ORT is shown crossing beneath the site at approximately 150 feet below ground. Shaded areas indicate the limits of construction and locations of intermittent road closures, with nearby streets, buildings, parking lots, railroad infrastructure, and the Allegheny River providing context for the construction site location.
What to expect during construction
Nearby residents may experience construction impacts, including intermittent noise during shaft excavation, potential noise from authorized nighttime work and increased truck traffic during certain phases of construction.
ALCOSAN is committed to working with nearby residents and local businesses to minimize disruption throughout construction. Regular information sessions will be held to keep the community informed about what to expect during each phase of the project.
Permitted work hours at this site will be:
General work hours*
- 6:00 a.m. to 8:00 p.m., Monday through Friday
- 7:00 a.m. and 8:00 p.m., Saturday and Sunday
*Impact-producing construction activities, such as pile driving and jackhammering, are limited to 8:00 a.m. to 6:00 p.m., Monday through Saturday. Controlled blasting activities are limited to 7:00 a.m. to 7:00 p.m., Monday through Friday, and 9:00 a.m. to 5:00 p.m. on Saturdays. Work hours exclude legal holidays; limited exceptions, including emergencies, may apply.
Extended hours for specific activities (night-time)
Certain activities at the A58 site will occur outside of the general work hours. These include:
- Authorized underground work and support activities: Certain underground construction and support activities may occur during extended hours.
- Surface activities: Any authorized surface activities occurring during extended hours will be limited to on-site work
What's happening at A58
Closures, public meetings and construction updates for the A58 site.
Get updates about AS1 construction, closures, and milestones.
Subscribe to receive site-specific notices for the AS1 construction site.