O06A Site

Site overview

The O06A site is located at the corner of Ella Street and Shingiss Street in the Bottoms neighborhood of McKees Rocks Borough. It will serve as an entry point into the tunnel system, capturing combined sewage from the surrounding area and directing it into the underground tunnel network.

Construction at O06A will include a vertical shaft approximately 25 feet wide and 150 feet deep, along with a regulator and a connector tunnel beneath Shingiss Street.

Site preparations, including the demolition of existing buildings, were completed in early 2026.

Ella Street & Shingiss Street, McKees Rocks Directions: Google Maps Apple Maps

Beneath the surface

Go beyond the construction fence and explore the O06A site.

Underground Cross Section

Cross-section illustration of the Ohio River Tunnel facilities underneath the O06A site located near the intersection of Ella Street and Shingiss Street in McKees Rocks Borough. An existing sewer connects to a regulator that directs overflow into a vertical drop shaft approximately 150 feet deep and 25 feet in diameter. The drop shaft connects to the Chartiers Creek Tunnel via a new connector tunnel located about 150 feet below ground surface. The new connector tunnel is called the Shingiss Street Connector Tunnel. It is approximately 1,900 feet long. The image also shows a tunnel vent location. Surface buildings, streets, trees, and subsurface soil and bedrock layers are displayed to illustrate the local context.

Aerial Site Plan

Aerial site plan showing the location of the Ohio River Tunnel (ORT) facilities underneath the O06A site near the intersection of Shingiss Street and Ella Street in the McKees Rocks Bottoms neighborhood. A regulator and a drop shaft connect to the Shingiss Street connector tunnel. The plan also identifies a tunnel vent. A shaded area indicates the limits of construction, with buildings and streets providing context for the construction site location.

What to expect during construction

ALCOSAN recognizes that the O06A site is located in a residential neighborhood and is committed to working closely with the McKees Rocks Borough and the project contractor to minimize disruption to nearby residents throughout construction.

Measures will be implemented to help minimize noise, dust and vibration, while keeping the community informed as work progresses. To help manage anticipated truck traffic, the project will also use dedicated truck-hauling routes and include road repairs and improvements where needed.

Permitted work hours at this site will be:

General work hours*

  • 7:00 a.m. to 7:00 p.m., Monday through Friday

*Impact-producing construction activities, such as pile driving and jackhammering, are limited to 8:00 a.m. to 6:00 p.m., Monday through Friday. Controlled blasting activities are limited to 7:00 a.m. to 7:00 p.m., Monday through Friday. Work hours exclude legal holidays; limited exceptions, including emergencies, may apply.

What's happening at O06A

Closures, public meetings and construction updates for the O06A site.