Allegheny River Tunnel (ART)

Total Length 6.2 miles
Construction Sites Under Design

The second tunnel project in the regional tunnel system.

Stretching approximately 6.2 miles underground, the ART will capture combined sewage from some of the region's largest and most frequent overflow points along the Allegheny River, preventing millions of gallons of untreated combined sewage overflow from reaching the river during rain events.

When complete, the tunnel will connect directly into the Ohio River Tunnel near the Veterans Bridge, forming a critical link in the regional system. The project will span six municipalities — the City of Pittsburgh, Millvale, Etna, Sharpsburg, O'Hara, and Aspinwall, and will include surface facilities to convey the combined sewer flow into the tunnel system below.

The infrastructure built as part of the ART project will address some of the heaviest combined sewer overflow volumes in the region — bringing cleaner water, healthier riverbanks, and improved quality of life to communities along the Allegheny River.

Status and projected tunnel path

The final design for a near surface portion of the project to be constructed in the Sharpsburg, O’Hara, and Aspinwall area was initiated in 2023 and is now advancing towards a 90% design. The ART final designer for the rest of the project was selected in 2024 and initiated work in January 2025. Design completion is anticipated in late 2027/early 2028.