Why didn’t we make the tunnels larger to capture all the overflows?

Capturing “all” the overflows would not be affordable for the region. The tunnel system is configured and sized to capture enough of the combined sewer overflows to meet water quality objectives. The size of the tunnels was established in collaboration with the regulatory agencies.